Crews will be onsite this Saturday, 1/28 from 7 a.m. to 5 p.m. working on fiber cement panels on the north and west sides of the tower.
During the week, crews will be continuing with various drywall installation, painting, and electrical work inside the building. Outside, the tower crane is still being used to move materials from the ground to various floors. Window and siding installation continues as well as roofing on the 7th floor.